OPEN THE PARCEL BEFORE PAYMENT. COUPON- AZADI-79TH → Get 10% OFF. FREE DELIVERY ALL OVER LAHORE.
NIX KITCHEN
Capture
Installation Guide

Installation Walkthroughs & Specs

Comprehensive setup instructions, clearance measurements, and ducting guidelines for contractors and homeowners.

1. Wall Mounting

Ensure solid structural backing to handle heavy glass or stainless chimney weight safely.

  • Maintain 24 to 30 inches height between hob and hood
  • Mount on solid brick or concrete walls
  • Use heavy-duty expansion wall plugs
  • Verify exact vertical leveling
2. Aluminum Ducting

Optimize suction efficiency and minimize operating noise with clean venting routes.

  • Keep aluminum exhaust pipe as straight as possible
  • Avoid tight 90-degree pipe bends
  • Seal exterior wall joints securely
  • Install exterior louvered vent cap properly
3. Power Connection

Protect digital touch controls and high-speed copper motors from current drops.

  • Provide a dedicated grounded 10A socket
  • Check stable voltage flow before casing
  • Test sensor touchpads properly
  • Keep power cord away from heat sources

Kitchen Hood Dimension Sheet

Official structural blueprints and clearance measurements for kitchen fitters.

Download PDF Blueprint
1. Marble Counter Cutout

Precise granite or marble cutting prevents structural cracking of your worktop.

  • Cross-check physical hob frame with template
  • Maintain necessary clearance margins
  • Apply silicone heat-sealant on edges
2. Gas Line Setup

Secure pipeline connections ensure safe flame distribution and leak prevention.

  • Verify LPG or Natural Gas nozzle setup
  • Use certified heavy-duty gas hoses
  • Perform soap bubble joint leak testing
3. Burner Adjustment

Calibrate air shutters to achieve steady blue flames without soot residue.

  • Connect electronic igniter securely
  • Adjust damper shutters for oxygen mix
  • Test all degi burners individually

Built-in Hob Cutout Template

Detailed dimensional guide showing under-counter clearance and gas inlet placement.

Download Cutout Guide
Site Preparation

Review key prerequisite criteria before installation work begins.

  • Inspect appliance body surfaces upon unboxing
  • Confirm kitchen cabinetry alignment
  • Keep user manuals and warranty cards ready
Safety Standards

Protect your kitchen investment with stable electrical earthing.

  • Ensure circuit breaker handles peak load
  • Verify proper wall earthing continuity
  • Keep flammable materials away from active flames

Need Custom Contractor Guidance?

Have unique kitchen cabinet measurements or complex layout questions? Connect directly with our technical support team.

Chat with Tech Support
Nix Kitchen